When fuel spills, solvent leaks, or historical land contamination occur on a development site, regulators require a quantitative assessment of how rapidly dissolved contaminants will migrate towards Controlled Waters (rivers, boreholes, or aquifers). Use our free calculator below—based on Darcy's Law and the 1D Advection-Dispersion Equation—to estimate groundwater seepage velocity and contaminant plume breakthrough time.
In hydrogeology and contaminated land risk assessment, dissolved contaminants migrate through saturated soil and rock via two primary physical mechanisms listed in classical physics: Advection (bulk movement carried along by flowing groundwater) and Hydrodynamic Dispersion / Diffusion (spreading out of the plume due to pore-scale velocity variations and concentration gradients).
Our screening calculator solves the 1D hydrogeological transport chain in four steps:
q = K × ivs = (K × i) / nevc = vs / Rf where Rf = 1 + (ρb / ne) × Kdtadv = L / vc (Center of Mass, 50% concentration arrival)During a Phase 2 Site Investigation, site-specific hydraulic conductivity (K) is measured via borehole rising/falling head slug tests or pumping tests. For initial desk-study screening, typical UK hydrogeological ranges are summarized below:
| UK Geological Stratum / Aquifer Type | Hydraulic Conductivity (K, m/day) | Hydraulic Conductivity (K, m/s) | Effective Porosity (ne) |
|---|---|---|---|
| River Terrace Gravels / Clean Coarse Sand | 10 – 100+ m/day | 10-4 – 10-3 m/s | 0.20 – 0.30 |
| Sherwood Sandstone / Medium Sand | 1.0 – 10 m/day | 10-5 – 10-4 m/s | 0.15 – 0.25 |
| Fractured Chalk / Karstic Limestone (Fissure Flow) | 5.0 – 50+ m/day | 5×10-5 – 5×10-4 m/s | 0.01 – 0.05 (Fracture ne) |
| Silty Sand / Weathered Mudstone | 0.05 – 1.0 m/day | 5×10-7 – 10-5 m/s | 0.10 – 0.18 |
| Glacial Till / Unweathered Clay Aquitard | 0.0001 – 0.01 m/day | 10-9 – 10-7 m/s | 0.03 – 0.08 |
Hopefully this tool helps you screen potential groundwater migration timescales on your site. If your site requires a formal Phase 1 Desk Study, Phase 2 Groundwater Monitoring, or Environment Agency Remedial Targets Methodology (RTM) modelling to discharge planning conditions, please call or email Southwest Environmental Limited.
Under the Environment Agency's Land Contamination Risk Management (LCRM) framework, any site with a viable contaminant-pathway-receptor linkage to groundwater or surface water must undergo tiered assessment. While simple travel-time screening demonstrates how rapidly a plume can reach a receptor, regulatory sign-off frequently depends on natural attenuation and biodegradation during transit.
In the Environment Agency's Tier 3 Remedial Targets Methodology (RTM), dissolved petroleum hydrocarbons (BTEX, MTBE, and TPH bands) and chlorinated solvents undergo microbial degradation as they travel through the aquifer. This exponential decay is governed by the half-life (t1/2) of the chemical and the plume travel time (t):
Special care is required on UK Chalk and Jurassic Limestone Principal Aquifers. Although chalk has a high total matrix porosity (often > 30%), groundwater flow occurs predominantly through narrow interconnected fractures whose effective fracture porosity (ne) is tiny (often 0.01 to 0.03). Dividing Darcy flux by a 0.02 fracture porosity results in rapid linear seepage velocities—explaining why Environment Agency Source Protection Zones (SPZ1 50-day and SPZ2 400-day boundaries) extend far up-gradient in chalk catchments.